Win more deals with fast climate data
Climate requirements have moved from the sustainability team to the bid folder. Those who can deliver verified emissions data on time win the deal – those who can't are filtered out before evaluation begins.
Data flow
From business data to tender-ready answers.
Raw data in
CO2check
AI engine
Tender-ready out
The requirements sit where the value is
Climate requirements are not evenly spread – they concentrate in the largest and most valuable deals.
of 2025 public tenders required emissions data
of the year's total tender value sat in those very tenders
the same verified climate data for every bid, customer survey and contract requirement
from a climate data request to a finished bid attachment
Figures refer to 2025 public tenders including emissions or climate data requirements and their share of the year's total tender value.
Why deals are lost
The deadline catches up with you
The request arrives with two weeks' notice. The data sits scattered across ERP, accounting, carriers and supplier emails – and someone works the weekend.
Suppliers don't respond
Scope 3 is most of the footprint, but supplier data arrives in different formats, units and rarely on time.
The number can't be defended
Without traceable methodology and a source per line, the number is a guess – and a guess won't survive evaluation or audit.
How you win the deal
The same data flow that produces the climate report also produces the bid documentation.
Bid documentation on demand
Export climate data per product, service, assignment or unit in the format the buyer asks for – with a source per entry.
Fast climate data, not perfect in a year
Hybrid methodology: spend-based where data is missing, activity-based where it exists. You get a defensible figure now and refine over time.
Points in the evaluation
When climate criteria are scored – not just pass/fail – the quality of your data ties directly to your win rate.
Follow-up during the contract
Many contracts require recurring climate reporting. The same data flow delivers the report each quarter without a new project.
From data to won deal
Connect the data
Accounting, ERP, energy, transport and supplier registers are connected once.
Calculate per GHG Protocol
Every line is classified and matched to EXIOBASE factors with traceable evidence.
Win the deal
Pull the right extract for the bid, customer survey or contract follow-up in minutes.
Frequently asked questions
How fast can we produce climate data for a bid?
Once the data flow is set up, bid documentation takes hours instead of weeks. For a first setup we start spend-based to give a defensible figure immediately, then add activity data over time.
What climate requirements appear in public procurement?
The most common are reported emissions for the delivered goods or service, organisation-level calculations (Scope 1–3), reduction commitments and recurring follow-up during the contract.
Will the figure hold up under review?
Yes. CO2Check uses the GHG Protocol and EXIOBASE, and every figure links to source, method and category so buyers or auditors can review it.
Is this only about public procurement?
No. The same data requirements now come from large private customers, banks and group procurement. The data you build for tenders is reused for customer surveys, CSRD reporting and contract follow-up.
The next request is coming
Set up your climate data before it's requested – and answer in hours when it is.
Book demo